Okrika Proposed Link Bridge: Reclamation, Week Two
Week two of the reclamation for the proposed Okrika Link Bridge in Port Harcourt: sand pumped through the pipeline and spread by excavator to build the fill across the site, overseen by Martins Otuya.
- Date
- June 2022
- Location
- Okrika, Port Harcourt, Rivers State, Nigeria
- Category
- Field Operation
- Record
- 3 frames
By week two of the reclamation for the proposed Okrika Link Bridge, the fill was already taking shape. Sand was pumped through the pipeline into the reclamation area, and excavators spread and shaped it across the site, building the ground up as the works progressed. The works were overseen by Martins Otuya.
The project was carried out at Okrika, Port Harcourt, in Rivers State, using Ellicott dredging equipment. The full story of how the reclamation came together will follow in a longer account. For now, we are grateful for the opportunity to deliver this work and to bring Ellicott dredging capability to Okrika.
Scope of work
- Week two of reclamation fill for the proposed Okrika Link Bridge
- Sand discharge through the pipeline into the reclamation area
- Excavator spreading and shaping of the placed fill
- Field recording of the works on video and stills
Outcomes & impact
- Reclamation carried through week two of the works
- Fill placed and shaped across the reclamation area
- Works documented for the project record